Takedown Renovations · Residential
Framing
The skeleton that everything straight, plumb, and square hangs on.
What framing actually involves
Framing is where the building's geometry gets set, every wall, opening, and ceiling that comes after is only as true as the frame. It's also where most of the structure's cost lives, and where errors compound. A square, plumb frame makes every trade faster.
What to plan for
The decisions that shape a framing project, and the ones that get expensive when they're made too late.
Engineering and load paths govern stud size and spacing.
Openings and headers are structural, not just layout.
A square, plumb frame makes every trade after it faster.
Inspections happen before insulation and drywall close it up.
How a residential project runs with us
A clear sequence is what keeps a framing project on time and on budget.
- 1
Site walk & assessment
We look at conditions, access, and what's behind the surfaces before we quote, the part underneath usually decides the scope.
- 2
Fixed-price scope & quote
You get a written scope and a number tied to it. The price moves only if the scope does.
- 3
Permitting & scheduling
We pull the permits the work requires and sequence the trades so the building stays dry and on schedule.
- 4
Build & close-out
Crews protect your home, do the work, and leave it broom-clean. We walk it with you before we call it done.
How we handle framing
We frame to the engineer's spec and to a tolerance the finish trades appreciate.
Request a Callback
Tell us about your framing project and we'll reach out within one business day.
Request a Callback
We'll get back to you ASAP.